⚑ Smart charging

Plug in more vehicles, without increasing your electrical connection.

Fuzz smart charging (also called load balancing or dynamic power management) continuously distributes the available power between all the charge points of a site. It is included from the Piloter pack and works with OCPP 1.6 charge points and charge points controlled over Modbus, whatever the brand.

What Fuzz smart charging does​

The Fuzz controller continuously measures the consumption of the site and of each charge point, calculates the power still available and sends each charge point the current setpoint it can use. When a vehicle arrives, leaves or slows down, the power is automatically redistributed between the vehicles present.

Smart charging takes into account:

  • the maximum power of the site's grid connection;
  • the maximum current of each switchboard, from the main low voltage switchboard down to the sub-switchboards;
  • the phases of each piece of equipment (single-phase or three-phase charge points, phase wiring);
  • the site's other consumption and production measured by the meters: building, photovoltaic, batteries;
  • the priorities of each charge point and each badge.

The principle is explained in the guide: Smart charging: how Fuzz distributes power. The site settings are in Smart charging settings.

Protecting the connection and the switchboards​

Fuzz smart charging never exceeds the limits you define for the site: the maximum power drawn from the grid and the maximum current of each switchboard. You avoid trips and subscribed power overruns, without any work on the installation.

These limits also enable peak shaving: by setting the maximum power of the site, you cut consumption peaks. For the capacity tariff, Fuzz measures and limits the quarter-hour peak (see Controlling the quarter-hour peak of the capacity tariff). With a battery, peak shaving goes further: see Batteries and energy optimisation.

πŸ‘‰ See the guide: Limit the power drawn from the grid and Switchboards.

Controlling the quarter-hour peak of the capacity tariff​

In Belgium, the capacity tariff makes the grid bill depend on the power peak: the average power imported over a quarter of an hour, the highest (or the N-th highest) of the month, sometimes also of the year. Fuzz measures this peak on the site's main meter and limits the draw in real time so that the month's peak does not grow:

  • capacity tariff described in the distribution system operator (DSO): price of the monthly and annual peak, rank of the peak (the 11th quarter-hour of the month for ORES and RESA, the highest for Sibelga), peak hours, degressivity. The DSO is configured once per connection level, the site only has to tick Capacity tariff;
  • the battery first: it discharges to shave the peak before the charge points are limited (configurable);
  • the charge points according to a chosen mode: go down to their minimum power (default), stop, or stay free when only the battery shaves;
  • start without waiting: enter the known peaks from the bills (month's peak, annual peak, last 12 months); otherwise Fuzz measures a full month before limiting;
  • monitoring in the Console: site overview, controller state and peak measurements in the Data Analyzer.

The maximum power of the connection remains the absolute instantaneous limit. Photovoltaic production is never limited by the peak. This function requires an up-to-date Fuzz controller and a meter on the main low voltage switchboard. With the predictive model (Predictive AI), the battery plan accounts for the peak cost: it may raise the month's peak when the energy gained pays for its cost (a new annual peak counts for 12 months), never going above the maximum power of the connection, and the real-time limit still protects the site. The charge points keep the normal threshold.

πŸ‘‰ See the guide: Grid tariffs: capacity tariff.

Priorities per charge point and per badge​

Each load receives a priority that decides its share of power when power is limited. The levels range from "never charge" to "maximum priority", including "charge only on solar surplus" and several high-priority levels. The priority comes from:

  • the badge used: the company fleet or premium customers before visitors;
  • the charge point: a charge point reserved for a priority use keeps its priority, after a delay that you choose;
  • otherwise the site's default priority.

Priority vehicles keep their power first during a rebalancing. Priorities are managed in the Fuzz Console and imported in bulk with the badges (CSV file).

πŸ‘‰ See the guide: Give priority to certain badges or vehicles.

Power optimiser​

A vehicle limited to 11 kW on a 22 kW charge point, or a nearly full battery that slows its charging, does not use all the power offered to it. The Fuzz smart charging optimiser detects this unused power and automatically reallocates it to the other vehicles that can use it. If the vehicle starts consuming more again, its share is given back gradually.

The optimiser is active by default on every site where smart charging is enabled, with the Piloter pack. Its settings are described in the guide: Smart charging settings.

Overload protection watchdog​

Fuzz smart charging includes a watchdog that continuously monitors the site's consumption against its limits. If unexpected consumption (a machine starting, a building peak) brings the site close to its limit, the watchdog immediately reduces the charge points' charging, then the power is rebalanced gradually as soon as the situation allows.

On an Edge site, the watchdog and all of smart charging run on the controller installed on the site: an Internet outage interrupts neither protection nor charging. On a Hybrid or Cloud site, control needs Internet. See Hosting modes.

Charging according to the sun and the electricity price​

Fuzz smart charging can also take into account photovoltaic production and the electricity price. These functions are part of the real-time model option of the Analyser pack:

  • charging on solar surplus: some loads use only the solar energy that would otherwise be injected into the grid, or receive a guaranteed minimum topped up with the surplus;
  • price modulation: when the day-ahead market electricity price exceeds a threshold, charging slows down or stops, then resumes automatically when the price falls again; thresholds are set for the site and for each badge;
  • photovoltaic curtailment when prices are negative, without touching charging.

Charging on solar surplus needs a meter at the site connection point. See Photovoltaics and, in the guide, Charge on solar surplus and Modulate charging according to the electricity price.

Following smart charging in real time​

The Fuzz Console shows, charge point by charge point, what smart charging is doing: measured power, requested power, setpoint sent, priority applied, as well as the grid exchange limit. The installer sees at a glance why a charge point is charging slowly. See the guide: Follow smart charging in real time.

A meter at the site connection point (main meter) is recommended: it measures the real consumption of the building and makes the power sharing more accurate.

The concrete benefit of smart charging​

Example: a site limited to 50 kW can charge 10 vehicles at the same time instead of 3 or 4 at full charge, without any work and without increasing the subscribed power.

The possible number of charge points depends on your connection, your other consumption and the vehicles' needs: contact Fuzz to assess your site.