2. Prepare a project
A successful commissioning is prepared in the office. This section gathers what you need to know and collect before installing the controller:
- the checklist of information to request from the customer, their electrician and their IT department;
- the choice of hosting mode (Edge, Hybrid or Cloud);
- the IT network prerequisites, to pass on as is to the customer's IT department;
- the survey of the electrical topology and of each asset's data.
These pages can be read without a Fuzz account: you can send the link to your customer.
Checklist before commissioning
All the information to gather before going on site to commission Fuzz: customer and site, controller and licences, grid connection and tariffs, electrical topology, list of assets with their communication data, IT network, badges and CPO, users and alerts.
Choose the hosting mode
A guide to choosing between the Edge, Hybrid and Cloud modes for a site: Modbus assets or only charge points, quality of Internet access, available IT network, need to operate without Internet. With typical cases and what to plan for each mode.
IT network
The network prerequisites to pass on to the customer's IT department: controller IP address, outbound connections to Fuzz (ports 22 and 443) and to cloud services, DNS and NTP, local network ports (Modbus 502, OCPP 8080, web interfaces), needs of a Hybrid or Cloud site, charge points connected over the Internet and the cloud MQTT broker.
Electrical topology survey
How to survey, before commissioning, the electrical topology of a site and the data of each asset: single line diagram, switchboards and ratings, meters, charge points and connectors, phases and rotation, Modbus TCP, Modbus RTU and OCPP data, web interfaces. With an example sheet.