3. Install the controller
This part is for the installer who fits the Fuzz hardware at a customer's site. An Edge site receives a Fuzz controller (Local Controller) that controls the site on the spot; a Hybrid site receives a small gateway that relays traffic to the Fuzz controller in the cloud; a Cloud site has no Fuzz hardware on site.
Follow the pages in order: check the datasheet, mount and power the controller, connect it to the site network, then link it to the site in the Console so that it goes online. The installer menu is used to set up the network and to follow the onboarding.
Controller datasheet
Characteristics of the Fuzz controller installed on site (Local Controller of Edge sites) - reComputer R1000 model, processor, memory, Ethernet ports, RS485, power supply, temperature, DIN rail mounting, warranty.
Physical installation of the controller
Install the Fuzz controller (Local Controller) on site - BOOT switch position, location, DIN rail, Ethernet cable on the right port, 12-24 V AC or DC power supply without polarity, first power-up.
Controller network connection
Connect the Fuzz controller to the site network - main port eth0 on DHCP or fixed IP address, service port eth1 at address 169.254.254.1, required Internet access, local traffic to OCPP charge points and Modbus assets, testing with Network diagnostics.
Controller installer menu
The Fuzz controller installer menu - access (browser port 1080, SSH, Installer SSH console in the Console, service port), credentials, network configuration DHCP or fixed IP, diagnostics, onboarding status, Fuzz Secure Link, NTP, logs, SIM PIN.
Putting the controller online (onboarding)
Put the Fuzz controller of an Edge site online - link its serial number to the site in Site Parameters > General attributes, follow the onboarding (installer menu, the company's onboarding logs), error messages and solutions (error 409, site not associated), check that the site is Online.
The gateway of a Hybrid site
The Fuzz gateway installed on a Hybrid site - what it does (Modbus TCP and RTU relay, RS485, asset web interfaces, 4G), what is not on site, onboarding, the gateway installer menu (Ethernet role, 4G, APN, status), firewall, Internet requirement and limits.