☀️ Photovoltaic installations

Connecting the photovoltaic (PV) installation to Fuzz makes it possible to measure solar production, to charge vehicles on the surplus and, if the inverter allows it, to limit production when necessary. Fuzz communicates with the inverter or with the data manager that groups the inverters (Huawei Smartlogger, SMA Datamanager…). The full form is described in Add a photovoltaic installation.

✅ Prerequisites​

ItemRequired
AssetAn inverter or data manager from the compatible list, using Modbus TCP, Modbus RTU or MQTT
Hosting modeModbus: Edge or Hybrid. MQTT: all modes
RoleAdministrator or Operator of the site
Inverter settingModbus enabled on the inverter or data manager (often disabled at the factory); for production limiting, remote power control allowed in the inverter

When several inverters are grouped by a data manager, preferably declare a single photovoltaic installation that queries the data manager.


📈 What Fuzz measures and controls on a PV installation​

Measurements: Fuzz reads the power produced, the current per phase and the energy produced, depending on what the inverter model exposes. They appear in Assets (State tab, Photovoltaics filter), in the Energy flow diagram of the site Overview page (PHOTOVOLTAIC) and in the asset history.

Control: if the Set power (flexible asset) box is ticked in the Supported actions card (unticked by default), Fuzz can send a power setpoint to the inverter to limit production:

  • to avoid exceeding the Maximum current (A) of a switchboard when production is too high;
  • when the electricity price is negative, if the Negative price PV curtailment option is enabled at the Smart charging step of the site parameters (see Smart charging settings).

If the box is unticked, the installation is only measured: Fuzz never changes production. Solar surplus is also used to charge low-priority vehicles: see Charge vehicles on the solar surplus. Surplus charging also requires a main meter.


🖥️ Declare the installation in the Console​

The form has six steps: Photovoltaic parameters, Photovoltaic protocol, Phase mapping, Console, Metrics, Monitoring.

FieldMeaningDefault
Photovoltaic nameName, unique on the site—
SwitchboardSwitchboard the installation feeds into—
MeterDedicated meter, only if the inverter does not provide its own measurementsempty
Maximum current (A)Maximum current of the installation per phase16
Correction factorPercentage of the measured production that Fuzz takes into account to calculate the available power: a safety margin because solar production varies quickly30 %
L1 / L2 / L3 Correction factor (%)Same factor, phase by phase30 %
ProtocolModbus or Mqtt, then ModelModbus
Supported actionsSet power (flexible asset)Unticked
Asset can be offline (Modbus configuration card)Tick it: an inverter often switches off at night, which is not a faultUnticked

The Modbus configuration (IP address, port, unit ID, or RS485 bus) is detailed in Modbus assets.

🔍 Check and troubleshoot a PV installation​

During the day, the installation must be Online in Assets with a power P (W) consistent with the sunshine. A power displayed as negative or reversed on a phase is corrected with Reverse current at the Phase mapping step.

SymptomProbable causeSolution
Offline every night, needless alertsInverter switched off without productionTick Asset can be offline
Offline during the dayModbus disabled on the inverter, wrong address or unit IDEnable Modbus TCP on the inverter; see Common Modbus problems
Production is never limitedSet power (flexible asset) unticked, or remote control refused by the inverterTick the action; allow power control in the inverter
Charge points do not charge on the surplusNo main meter, badge prioritiesSee Charge vehicles on the solar surplus